Questions? Give Us a Call
(678) 940-6433

B2W Software Survey: Heavy Construction Scheduling

B2W Software Survey: Heavy Construction Scheduling

Keep up with the latest from CCR-Mag.com

Fill out the form Below

B2W Software, a leading provider of heavy construction management software, released results of a new survey conducted by Fishnet Media on challenges, opportunities and technology related to resource scheduling and dispatching.
More than 200 contractors from throughout North America participating in the survey confirmed the dynamic nature of the construction scheduling workflow and the significant financial risks and rewards associated with getting people, equipment and materials to the right place at the right time. More than 40 percent said scheduling and dispatching problems impact project timelines and budgets on a daily basis.
Real-time visibility across various roles emerged as an important goal in the survey, but older, offline tools remain prevalent. Nearly 75 percent of contractors indicated that spreadsheets, whiteboards or paper were their primary tool for managing resource scheduling and dispatching. For 91 percent of those surveyed, phone calls, emails or text messages were the main method of communicating changes in the schedule.
Respondents in the B2W Software survey listed the opportunity to standardize communication across the office, shop and field as the leading driver for investing in new technology for scheduling and dispatching. Shared visibility of resources in real time (56 percent), a push to adopt more technology company wide (52 percent) and optimizing heavy equipment utilization (40 percent) were also among the top reasons for investment.
“According to the survey, contractors recognize the efficiency and cost-saving advantages of having people across their organizations see the schedule – including continuous updates – in real time,” said Paul McKeon, CEO and founder of B2W Software. “Most, however, are just beginning to consider replacing outdated tools with the specialized software that would allow them to achieve this.”
Heavy civil construction contractors spanning a wide range of specialties completed the B2W survey in late 2019. Respondents included owners, executives and project managers as well as schedulers, dispatchers, field operations managers, CFOs, finance managers and IT personnel. Annual revenue for their companies was as high as $250 million, with 30 percent in the $2.5 – $10 million range and 26 percent in the $10 – $25 million range.
Detailed results of the survey on heavy construction scheduling and dispatching sponsored by B2W Software are available at https://resources.b2wsoftware.com/whitepapers-2.
About B2W Software
Headquartered in Portsmouth, New Hampshire, B2W Software empowers heavy construction companies to “break new ground” by winning more work and completing it more profitably. The company’s ONE Platform connects people, workflows and data and includes advanced, unified applications to manage estimating, scheduling and dispatching, field tracking, equipment maintenance, forms and business insight.

Events

Read more BELOW

 

The 2024 virtual Men’s Round Table will be held Q4, 2024, date TBD.

2024 Virtual Men’s Round Tables

2023 Virtual Men’s Round Table was held on November 7th, 2023 via Zoom.


 

2024 Virtual Women’s Round Table

2023 Women’s Round Table #1 was held on October 20th, 2023 via Zoom

News

Chicken Salad Chick in unique position to expand

With few other chicken salad restaurants on the market, Chicken Salad Chick describes the business as “a category of one.” Chicken Salad Chick finished last year with 255 locations and expects at least 40 openings in 2024, and it envisions a total addressable market of

Supplements/Podcast
See Website for Details

This content (including text, artwork, graphics, photography, and video) was provided by the third party(ies) as referenced above. Any rights or other content questions or inquiries should be directed such third-party provider(s).

Receive the CCR 2024 Idustry Report

Get ahead of your Competitors with CCR's FREE Industry Insider's Report 2024!

Always stay two steps ahead of your Competitors. Stay informed with the latest in the Industry. 

This site uses cookies to ensure that you get the best user experience. By choosing “Accept” you acknowledge this and that ccr-mag.com operates under the Fair Use Act. Find out more on the Privacy Policy & Terms of Use Page